Availability: | |
---|---|
Quantity: | |
MEB
MOOGE
84778000
Product Description
CAD Solidworks Layout:
Standard System Process Line:
1.Conveyor Belt→Plastic Crusher (wet Crush)→Friction Washer Loader→Float Washing Tank→Screw Loader→Plastic Dewatering Machine→Hot Air Dryer System→Zig Zag Label Separator→Silo
Advance System Process Line:
1.Conveyor Belt→Plastic Crusher (wet Crush)→Friction Washer Loader→1# Float Washing Tank→Screw Loader→ High Speed Dewatering Machine →2# Float Washing Tank→Friction Washer Loader→High Speed Dewatering Machine→Hot Air Dryer System→Zig Zag Label Separator → Silo
Note:Shredding Machine Can Be Replaced Crusher Machine ,We Supply Single Shaft , Double Shaft , Four Shaft Etc.
Machine Parameter
Standard Model :
Model | Capacity | Power | Water Supply | Area Require |
MEB-300 | 300 kg/h | 100 kw | 4-5m3/h | 20*4.5*5m |
MEB-500 | 500 kg/h | 115 kw | 5-6m3/h | 20*4.5*5m |
MEB-1000 | 1000 kg/h | 125 kw | 7-8m3/h | 23*5*5m |
MEB-1500 | 1500 kg/h | 180 kw | 8-10m3/h | 25*5*5m |
MEB-2000 | 200 kg/h | 225 kw | 10-15m3/h | 28*5*5m |
Advance Model:
Model | Capacity | Power | Water Supply | Area Require |
MEB-300 | 300 kg/h | 130 kw | 5-6m3/h | 38*4.5*5m |
MEB-500 | 500 kg/h | 145 kw | 7-8m3/h | 38*4.5*5m |
MEB-1000 | 1000 kg/h | 190 kw | 8-10m3/h | 42*5*5m |
MEB-1500 | 1500 kg/h | 230 kw | 10-15m3/h | 45*5*5m |
MEB-2000 | 200 kg/h | 280 kw | 15-20 m3/h | 45*5*5m |
Note: Over 2000 kg/h , the recycling system need specail customzied it from us with customer
Machine Photos
1.Double Shaft Shredder Machine
2.Plastic Crusher Machine With Wet Water Crushing
3. Friction Loading Washing Machine
4.Hot Washing Tank
5.Float Washing Tank + Side Screw
6. Horizontal Plastic Dewatering Machine + Hot Air Dryer
7.Before Shredding and Crushing
8. Finally Produce-Rigid HDPE PE PP LDPE BOSS ABS PS PC Flakes
Company Service
Our Service:
1.Pre-sale: we given client the details technician offer, sign the sales contract etc
2.In-sales: we supply the details layout, installation instruction, technician support for the clients
3.After sales: we arrange engineer to install the machinery and training the workers for client
4.We have 24 hours team to solve the after sales problem
5.We have free spare parts with the machine
6.We supply long term spare parts for every customer
7.We always update the new technology to every customer
Company Team
content is empty!